Lead Pipe Replacement Scheme

Lead pipe replacement scheme

Our lead replacement scheme is now closed. It will reopen in spring 2027. We appreciate your patience and look forward to accepting new applications again when the scheme reopens.

If you’re replacing lead pipework, we can also replace any lead pipework that belongs to us. This is provided you qualify and are responsible for the pipework.

Pipework responsibility

The location of the pipework will determine if it’s your or our responsibility.

Your responsibility

You own the internal pipework and the supply pipe. This pipe starts at your outside stop valve and ends at your inside stop valve. These pipes can either be separate or shared. Many older properties are served by a shared supply pipe.

Shared supply pipes are your and your neighbour’s responsibility to maintain and replace. You’ll each be responsible for any branch of pipe that solely feeds your property. If you’d like your own supply pipe, get a quote for a new water connection.

If there are any lead pipes or lead solder internally, you need to arrange the removal of this with an approved plumber.

Our responsibility

We own the communication pipe. This starts at our water main and usually runs to the outside stop valve at your property boundary. We’re responsible for fixing or replacing these pipes.

How to apply for the lead pipe replacement scheme

The lead pipe replacement scheme is a like for like replacement. This includes the size and location of the pipe. Existing smaller pipes (12-15mm) will be replaced with the industry standard sized pipes (25mm). If the current lead supply is bigger than 25mm pipe, we’ll match the current diameter. We go through the steps involved in applying for the lead pipe replacement scheme:

  1. Check your supply pipe arrangements
  2. Decide what type of plumber to use
  3. Check you meet the criteria
  4. Make sure you meet the Water Regulation requirements
  5. Certificate accepted reconnection survey passed

Step 1: Before you apply and checks to do

To confirm if you have lead pipework and if you’re on a shared supply, you’ll need to check your supply pipe. To do this, check your stop valve outside of your property. You’re likely on a separate supply if you have a stop valve and your neighbours have one. If there is one, but your neighbours don’t have one, you can share a supply. In front of your property if there is no outside stop valve, you may be sharing a supply with your neighbours. If you’re not sure on your supply, speak to your plumber or call us.

You can contact us to discuss moving to a single supply. We do not offer services to separate supplies under this scheme.

Check your earthing

You’ll need to check your earthing if you answer yes to any of the following:

If you’re unsure how to check your earthing, contact your electricity supplier or a qualified electrician.

Step 2: Decide what type of plumber to use

You’ll need to decide whether to use an independent plumber or an approved plumber and get quotes.

Independent plumber

If you use an independent plumber, the pipe laid within the open trench must be inspected by Thames Water. This must be done before burying. You will need to arrange the survey either by calling or emailing us.

Approved plumber

An approved plumber will issue a certificate about the work they carried out. No open trench inspection is required, but you will need to email us the certificate. View a list of WaterSafe approved plumbers.

Step 3: Check you meet the criteria and apply

You can apply for the lead replacement scheme if you:

Our lead pipe replacement scheme is currently closed. It will reopen in spring 2027.

Step 4: Read through the guidance and meet regulations

After applying make sure you read all the guidance sent in the email and focus on:

If using an approved plumber, please email a copy of the certificate they have issued you. For independent plumbers, call us to arrange an inspection. Please only do this once you’re ready and the pipe is laid within an open trench/a vault.

Meet water regulations

You will need to comply with the below to pass a reconnection survey:

For pipes running via basement/vault, the customer is responsible for wall breakthroughs.

Step 5: Certificate accepted / reconnection survey passed

Once the certificate and reconnection survey has passed and you’ve qualified, the engineer will:

The task will be passed to our planning and operational teams to ensure that the work is planned in. Our planning team will need to organise permits to work and traffic management. Once permits and traffic management are approved, the day can be planned in. The reinstatement works usually take place within two working days after the replacement.

What you can do

If you had an excavated trench, it can now be backfilled. Until work is complete, flush the cold kitchen tap for approximately two minutes before using. This should clear any water that has been standing in the lead pipework. You can then use your cold kitchen tap as normal for drinking and cooking.

Completing the replacement

We’ll aim to complete the replacement within three months from qualifying. The replacement is complete once the communication pipe and road have been reinstated. On the first day after the replacement is complete, run all taps used for drinking or cooking for 10 minutes. This includes water fountains.

If the survey was not passed, please follow the instructions the engineer provided. We also go through what happens next in our guidance email. Without a passed survey or certificate from an approved plumber, you can’t qualify.

Please call us if you would like to cancel the replacement.