Internal metering for developers

Internal metering

As a developer, you’ll need to install a meter for all new supplies. These meters should be ordered directly from us.

Pay for the quote

Once you’ve applied for your new water connection, we’ll send you a quote to review and approve. You’ll then need to pay for your quote.

Order and delivery

Use the meter ordering form or contact us to place your order of up to 200 meters. The delivery time is 4 to 6 weeks, to the site address.

We recommend ordering when you’re ready to install as you’ll have to pay for replacements.

Install the meters

Meters must be installed for each premises in a way that is safe to access for readings and maintenance.

When installation is complete, please call us on 0800 009 3921 to let us know. For full guidance, read our metering code of practice.

We’ll check the meters

An engineer will visit the site to check installation has been done correctly. They’ll also collect the serial numbers.

If you’re on our smart meter network, the engineer might install local communication equipment (LCE).

Billing account set up

The billing account will be set up in the developer’s name.

We’ll update this when we receive handover information, or when the new occupier contacts us to set up their account.

Non-household properties

Once the meters have been installed, an engineer will check it’s been done correctly. Our team will then pass the meter information to the market operator. The market operator will notify the retailer, who’ll then contact the developer about billing until the property is handed over to the new occupier.

Can I refuse to install smart meters?

Since 1991, all new build or newly developed properties are required, by law, to have a water meter installed.

We have statutory powers under Sections 162(3) and 172 of the Water Industry Act 1991 to enter your premises to maintain, repair, disconnect, or remove the water meter, or any other works that we consider to be necessary or expedient for any purpose connected with carrying out of any of these metering works.

This notice of entry is served in accordance with Part II of Schedule 6 of the Water Industry Act 1991. If you refuse entry and/or prevent us from exercising our statutory power to carry out these metering works, we will apply to the Magistrates Court for a Right of Entry Warrant.

Are smart meters safe and secure?

The smart meters we use comply with UK and EU safety regulations.

We commissioned an independent report from the National Centre for Environmental Toxicology (NCET), to review of the possible health effects of smart water meters. This was completed in February 2014. You can view it on their website.

The report shows that emissions from smart meters are similar to, or much less than, emissions from other household equipment, like mobile phones.

You can also find out more information about the health effects of radio frequency electromagnetic fields on GOV.UK.

How secure is data collected from smart meters?

All data collected from smart meters is kept on our secure database, along with your account details. This data will not be with third parties who aren’t working on our behalf. The readings sent from your smart meter to us are encrypted.